-
RB 77/00008 Murray Bridge abattoir pollution assessment. Progress report no. 1.
The Murray Bridge Abattoir is located 1.2km from the River Murray proper on the western edge of Mobilong Swamp. The Abattoir disposes of 0.7 to 0.8 Ml of effluent on each week day and until recently, all effluent was poured down four drainage wells....-
Document
Published: 01 Jan 1977
-
Report to SENRAC on the evaluation of coal types in the Bowmans deposit - phase 1.
Coal types and associated quality throughout the coal zone were assessed and the relationship between coal and quality parameters was evaluated.-
Document
Published: 01 Jan 1988
-
Source rock evaluation of Alinya Formation, Giles 1. Data summary and preliminary interpretation.
Preliminary analysis of 6 core samples from 1237-1266 metres depth in Giles 1 has revealed poor to fair organic richness, low concentrations of extractable organic matter and low hydrocarbon yields. Rock-Eval pyrolysis has confirmed the presence of...-
Document
-
Bunabie. Progress reports to licence expiry/full surrender for the period 18/5/1972 to 17/11/1972.
In a search for carbonate mineral bulk raw materials suitable for use at the BHP Whyalla blast furnace as fluxes in steel-making, 5 exploratory vertical rotary core holes totalling 200 m were drilled on the Nullarbor Plain near the coast and 28 km...-
Document
-
Koonalda. Progress reports to licence expiry/full surrender for the period 18/5/1972 to 17/11/1972.
In a search for carbonate mineral bulk raw materials suitable for use at the BHP Whyalla blast furnace as fluxes in steel-making, 5 exploratory vertical rotary core holes totalling 130 m were drilled on the Nullarbor Plain near the coast and south of...-
Document
-
Nullarbor. Progress reports to licence expiry/full surrender, for the period 18/5/1972 to 17/11/1972.
In a search for carbonate mineral bulk raw materials suitable for use at the BHP Whyalla blast furnace as fluxes in steel-making, 5 exploratory vertical rotary cored holes totalling 189 m were drilled on the Nullarbor Plain near the coast just west of...-
Document
-
Poondinga, Jellabinna, Pureba North, Kalanbi, Penong, Chinta and Ceduna (the Eucla Basin Heavy Mineral Sands Project tenement Group 2). Joint annual reports for the period 2/11/2004 to 30/9/2015.
Iluka Resources’ Eucla Basin Heavy Mineral Sands Project tenement Group 2 consisted initially ELs 3268, 3283, 3322 and 3330, which spanned the south-eastern portion of the Eucla Basin, extending from 24 km to 140 km north of Ceduna. Regionally, the...-
Document
Published: 28 Feb 2016
-
Data release [made at SA Director of Mines' discretion] : Crystal Brook, Port Broughton, Port Pirie, Mundoora and Winninnowie (the Moonta North Project). Annual reports and combined annual reports for the period 19/10/2000 to 1/8/2008.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of exploration across a number of scattered Exploration Licences trending from Port Broughton in the south to...-
Document
Published: 18 Sep 2008
-
Penong B area and Yumbarra (part of the Eucla Basin Project tenement Group 2). Joint final report at licences' joint expiry/full surrender, for the period 16/11/2012 to 15/11/2017.
Two adjoining areas located north of Koonibba were taken up to explore this part of the south-eastern Eucla Basin for possible buried economic marine placer deposits of heavy mineral sands (HM), because they were believed to contain shallow or exposed...-
Document
Published: 12 Sep 2017