-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
Parndana. Annual reports and final report to licence expiry/full surrender, for the period 27/10/2006 to 26/10/2008.
Exploration for possible economic stratiform/syngenetic base metal deposits and/or structurally controlled epithermal/hydrothermal gold and uranium occurrences within Lower Cambrian metasediments over the central section of Kangaroo Island included...-
Document
Published: 22 Apr 2009
-
Data release [made at SA Director of Mines’ discretion] : Teetulpa Goldfield. Combined annual, annual and progress reports, plus related technical consultants' reports, submitted until licence renewal/re-issue, for the period 24/11/1995 to 14/11/2006.
An area surrounding and extending to the south of the Teetulpa Goldfield, which is centred about 60 km west of Olary and 31 km north of Yunta, was taken up primarily to try to find the source for the significant (>100,000 ounces so far recovered)...-
Document
Published: 05 Jun 2006
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007