-
RB 81/00099 Stuart Highway, Baker Well to Gosses section. Drilling for construction water.
13 of 38 wells were completed as production wells. Pump testing showed that 6 were capable of yielding 50 kl/day or more for 2 year period. Salinity was in excess of 10 000 mg/L TDS except near Glendambo where water from 4000 to 8000 mg/L was...-
Document
Published: 01 Jan 1982
-
RB 81/00097 Stuart Highway reconstruction, Pimba to Baker Well section. Water well drilling program.
4 of 7 wells were successfully drilled near Wirraminna Rail Siding and should be adequate for highway requirements for compaction water. Groundwater quality in all cases is saline (over 16000 mg/L TDS).-
Document
Published: 01 Jan 1982
-
RB 82/00059 Marla town water supply investigation - Completion report SA.
Extra drilling and testing of 13 wells (523 metres) has revealed a 2 aquifer system.-
Document
Published: 01 Sep 1982
-
RB 78/00030 Coober Pedy town water supply groundwater investigations report no. 2 - EWS Department.
The proposed town water well SR11 (60 metres) 22 km NE of Coober Pedy was drilled and tested. Water quality is acceptable.-
Document
Published: 01 Jan 1978
-
RB 85/00036 Stuart Highway, supplementary drilling for construction water south of Marla.
2 production wells (389 metres) were pump tested. The aquifers are Adelaidean slates and carbonates beneath 100 metres of dry Mesozoic sediments. 5642WW24 is estimated to have a 100 day yield of 0.5 l/s and 5642WW26 4.1 l/s. The thick unsaturated...-
Document
Published: 01 Jul 1985
-
RB 84/00085 Stuart Highway - Gosses to Mirikata section, drilling for construction water.
11 of 16 wells were completed as production water wells. Responses to test pumping were mostly of the Boulton delayed yield type. Yields range from less than 0.5 litres to 3.7 litres and salinities from 4 000 to 1 300 mg. Only 2 wells penetrated...-
Document
Published: 01 Oct 1984
-
RB 81/00080 Proposed township near Glendambo. Water supply project.
The area close to well 6036WW122 offers the best site for developing water supply for small town on the Coondambo to Gosses section of the Stuart Highway. Long term yields will depend on the size and frequency of recharge events in a small swamp. This...-
Document
Published: 01 Jan 1981
-
RB 81/00081 Marla town water supply investigation - Progress report no. 1.
Drilling has shown that there are 2 aquifers, both semi-confined with probable hydraulic connection. The main area of recharge appears to be 3 ephemeral swamps south of the town. 13 wells were drilled with salinity of 800 - 2500 mg/L but near swamps...-
Document
Published: 01 Jan 1981
-
RB 82/00027 Great Artesian Basin. Report on Clayton no. 2 well.
Well was drilled to 555 metres as part of an assessment of water potential and stratigraphy of the area. The full thickness of the Jurassic aquifer was not penetrated. Salinity is 1 100 mg/L, but the water would require treatment for excessive sodium...-
Document
Published: 01 Jun 1982
-
RB 81/00043 Mintabie Opalfield town water supply investigations.
Pump testing of existing supply well indicated high nitrate levels and limited supply life. 2 exploration wells were drilled. The first yielded greater than 800 m3/day with total dissolved salt level of 2737 mg/L. The second yielded water supply of...-
Document
Published: 01 Jan 1981
-
RB 98/00016 Statement of environmental objectives for seismic operations in the Cooper and Eromanga Basins, South Australia.
This document contains the environmental objectives relating to seismic exploration activities required to be achieved by any licensee operating in the South Australian part of the Cooper and Eromanga Basins (i.e. any operator). Objectives have been...-
Document
Published: 01 May 1998
-
RB 96/00033 Eromanga Basin. Exploration opportunity.
Areas ER96-A, B, C and D located in the Eromanga Basin, South Australia, are available for Petroleum Exploration Licence applications until 27/9/96 by invitation via this promotional brochure, prepared for distribution to industry both locally and...-
Document
Published: 01 May 1996
-
RB 88/00087 Coober Pedy Precious Stones Field - CRA Exploration Pty Ltd drilling, 1987.
3 diamond and 15 rotary-percussion holes were drilled in 1987 by CRA within EL 1330 on the southern part of the Field (PSF), this licence having been granted to the company for the exploration of strata below 50 metres depth in the subsurface. The...-
Document
Published: 01 Nov 1988
-
Olympic Dam Project. [Artesian] mound springs of the Lake Eyre South region [environmental] monitoring : half-yearly reports for the period from April 1998 to October 2005.
There is no abstract created for this record-
Document
-
Olympic Dam Project : operator's reports on hydrogeological investigations, Great Artesian Basin wellfields, for the period 1995-2004.
There is no abstract created for this record-
Document
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 1914
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Soil and groundwater investigation, Beverley prospect, SML 564. Report on Stage I feasibility study.
The Stage 1 feasibility study carried out during February-May, 1973 has included regional groundwater studies, pumping tests, logging and laboratory tests on drill cores, slope stability analyses, preliminary design of pit slopes and dewatering...-
Document
Published: 31 May 1973
-
Report on preliminary feasibility study of use and mining of coal from deposits in an area near Lake Phillipson, South Australia.
Exploration drilling by Utah Development Co. during 1973 and 1974 in the area covered by EL 125 has outlined at least 2,000 million tonnes of medium quality steaming coal, of a quality considered to be comparable to that for coal from ETSA's Leigh...-
Document