-
RB 2008/00016 Review of the Burra Mine Project, 1980-2008 - a progress report.
The Burra (Burra) Mine, situated 150 km north of Adelaide within the Adelaide Geosyncline, produced 2.7 million tonnes of copper ore in two major mining phases - 1845-1877 and 1970-1981. The first phase was initially progressed by underground...-
Document
Published: 01 Jan 2009
-
Burra mine 3D model (3D pdf version).
The Burra mine 3D model was constructed using a georeferenced version of the original hand-drafted base map, which included elevation data points surveyed during the final phase of mining. These elevation locations and associated height data were...-
Model
Published: 27 Jan 1909
- PDF,
- ZIP
-
Burra mine 3D model. Data package.
The SADME 1980-1981 Burra mine field mapping project was undertaken at short notice, in order to collect unique geological data and location survey information from the lower benches of the then actively worked open pit mine, before the newly exposed...-
Model
Published: 18 Sep 1912
- PDF,
- ZIP
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1978 to 28/9/1979.
As part of ongoing base metal exploration of the area surrounding Bute, initial work done after the expiry of EL 248 comprised the completion of one diamond drillhole to TD 411.2 m within Carpentarian basement, targeting a magnetic anomaly thought to...-
Document
Published: 20 Nov 1979