Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Data release [made at SA Director of Mines’ discretion] : Waddikee. Annual reports to licence expiry/renewal, for the period 24/5/2005 to 23/5/2010.
An area centred ~20 km south-southwest of Kimba is being explored for possible buried Tanami style orogenic lode gold and also for Mount Isa / Broken Hill style base metals mineralisation, which could occur within reactive chemical and pelitic...-
Document
Published: 10 Aug 1910
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 1903
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release at the third renewal / partial relinquishment of the latter licence : progress and annual reports for the period 14/2/1989 to 30/8/2003. [Index Part 2 of 2].
Abstract continued : During January-February 1993, five traverses spaced 800 m apart of RAB drillholes put in 50 m apart (57 vertical holes for a total penetration of 2688 m) were completed at Death Adder prospect by Aberfoyle Resources to appraise...-
Document
Published: 16 Oct 1903
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
Verran (part of the Kimba-Verran Joint Venture Project, and also part of the Eyre Peninsula Joint Venture Project). Annual and combined annual reports for the period 28/6/2002 to 11/7/2009.
No field work was conducted on the subject licence area, which comprises three sub-blocks, for all of Years 6-11 (period 2002-2008) on EL 2981. During Year 8 of the project (8th March to 28th December 2004), exploration activities were reported...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Verran. Annual reports to licence expiry/renewal, for the period 4/4/1997 to 3/4/2002.
Part of the Cleve Uplands centred 15 km west of Cleve has been taken under licence to explore its potential for buried economic copper-gold mineralisation to occur within Archaean or Proterozoic basement rocks. Other possible commodities of interest...-
Document
Published: 05 Sep 1902
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document