-
Mount Treloar (NW of Oodnadatta). Progress and final reports for the period 30/6/80 to 29/12/80.
Follow-up investigations of possible buried channel redox front uranium mineralization on the edge of the Eromanga Basin, in the vicinity of the SA-NT border, included a geophysical and structural interpretation of available data, the drilling and...-
Document
Published: 23 Feb 1981
-
Musgrave Province, including APY Lands, Mineral Potential Modelling Data Package.
The purpose of this data package is to provide end-users with the GIS datasets and geophysical raster grids used for the 2010 modelling of mineral potential in the Musgrave Province region, which includes the APY (Anangu Pitjantjatjara -...-
Model
- ZIP,
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017