-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 1907
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Data release [made at SA Director of Mines' discretion] : Manunda. Annual reports submitted until the commencement of joint reporting on the Razorback Ridge Iron Ore Project, for the period 10/12/2007 to 9/12/2009.
The banded iron formations associated with various tillite in South Australia have been recognised as being potential sources for iron however the low-grade nature of these bands has been one of the limiting factors in why they have not been...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Mount Grainger (Oodla Wirra). Progress reports and final report to licence expiry/full surrender, for the period 8/10/1970 to 7/10/1971.
Extensive literature and geological and geochemical field investigations of historic mines and prospects at the Mount Grainger and Oodla Wirra Goldfields have failed to disclose any remaining economic gold occurrences. The sparse native gold occurs...-
Document
Published: 12 Oct 1971
-
Data release - as updated [made at SA Director of Mines' discretion] : Eurilla, Lake Gilles, Moseley Nobs and Uno (the Northern Eyre Peninsula Project). Joint annual reports for the period 1/6/2010 to 31/5/2018.
Four tenements, which all lie within a 60 km radius to the north of the township of Kimba, and are mostly located around Lake Gilles, are continuing to be explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 30 Jul 1918
-
Bindyi South. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 24/11/2017.
An area located immediately south of Bindyi Homestead on Koonamore Station was taken up to explore for possible economic stratabound iron ore (magnetite) hosted by metamorphosed Adelaidean glacial sedimentary strata of the Yudnamutana Subgroup....-
Document
Published: 24 Nov 1917
-
Wildingi [Claypan] and Galaxy [Outstation]. Licence-specific annual reports, plus joint final report to licences' joint full surrender, for the period 22/11/1995 to 13/4/1999.
21 gold exploration targets with anomalous regolith Au > 10 ppb were generated by extensive regional and infill calcrete sampling of an area 80 km south-west of Coober Pedy. Aircore, RAB and RC drilling at four of these prospects (269 holes, total...-
Document
-
Mergenia. Information status at licence expiry/full surrender, for the period 2/5/2011 to 1/5/2016 : no work performed.
There is no abstract created for this record-
Document
-
Boolcunda (part of the Springfield Project). Information status at licence surrender, for the period 9/9/2009 to 7/4/2016: no work performed.
There is no abstract created for this record-
Document
Published: 09 Oct 1915
-
Data release [made at SA Director of Mines' discretion] : Mount Goddard, Mount Deception, Parachilna, Yandina Hill and Ben Lomond (the Flinders Ranges Project). Joint annual reports for the period 14/10/1999 to 27/4/2018.
A group of jointly reported tenements in the northern Flinders Ranges region is being explored for economic base metal mineralisation that might have formed within Late Proterozoic to Middle Cambrian continental rift margin sediments, probably with...-
Document
Published: 25 Jun 1918
-
Caltowie (part of the Jamestown Project). Fourth partial surrender report, for the period 10/9/2004 to 9/11/2014.
70% of the area of EL 4368, centred 15 km east of Laura in SA's Mid-North, was relinquished late in 2014. No work had been done on this ground by licensee Flinders Mines since the previous partial relinquishment that occurred at licence renewal on...-
Document
-
Yardea. Information status at licence expiry/full surrender, for the period 6/12/2013 to 5/12/2015: no work performed.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Coober Pedy Project. Annual reports, joint annual reports, and final reports at individual licences' full surrender, for the period 4/4/2011 to 3/4/2015.
Five separate areas located in the northern Gawler Craton adjacent to the Mount Woods Domain, which to date have received only minor attention from mineral explorers and so have had limited drilling done, have been explored for possible buried...-
Document
Published: 15 Apr 1915