-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona JV Project area (including Benagerie and Kalkaroo). Combined annual reports for the period 10/5/2003 to 31/12/2007.
Ongoing exploration carried out by project operator Havilah Resources under its newly ratified, twelve exploration licence Curnamona Project Amalgamated Expenditure Agreement, for the period 15/10/2003 to 31/12/2004, consisted mainly of drilling done...-
Document
-
Carthew area. Early results of field assessment (with mineralogical appendix) Jan., 1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
Economic assessment of molybdenite and scheelite mineralisation, Spilsby Island, SA.
There is no abstract created for this record-
Document
Published: 16 Jan 1967
-
Anabama Hill. Progress reports to licence expiry/full surrender for the period 1/12/1968 to 30/11/1970.
After its initial stream sediment sampling and rock chip sampling had revealed that significant base metal anomalism (Mo to 600 ppm and Cu to 300 ppm) exists on and near granitic rock outcrops at Anabama Hill, Asarco undertook detailed 1:1200 scale...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-55, exploring Kalkaroo Dome copper-gold mineral prospects for extensions of the Kalkaroo deposit. Project final report.
The Kalkaroo Cu-Au-Mo deposit is located 65 km north of Olary and 100 km west of Broken Hill, and occupies a portion of very prospective Palaeoproterozoic Bimba Formation subcrop, which potentially could have a 40 km strike length around two buried...-
Document
-
Coonalpyn. Progress reports and final report to licence full surrender, for the period 29/3/1982 to 6/9/1985.
Cambrian rocks lying beneath relatively thin Phanerozoic cover on the western edge of the Murray Basin were targeted by CSR principally for stratiform volcanogenic massive copper sulphide deposits, and for epigenetic Palaeozoic gold occurrences...-
Document
-
Woolatchi Creek. Progress, partial surrender and technical reports to licence surrender, for the period 12/4/1982 to 27/8/1985.
Diamond drillhole WC1 was drilled by Marathon to a total depth of 173.5 m over the Woolatchi Creek aeromagnetic anomaly, as part of an ongoing search for uranium and base metals in the north-eastern Flinders Ranges and Lake Frome Plains region....-
Document
-
Netley Hill. Progress and final reports to licence expiry/full surrender for the period 1/12/1968 to 30/11/1969.
A rotary percussion drilling programme (8 vertical holes for a total penetration of 1920 feet) was undertaken at Netley Hill to look for economic copper and molbdenum mineralisation in a greisen (hydrothermally altered granite) body which has an...-
Document
Published: 19 Nov 1970
-
Colebatch. Progress reports and final report to licence expiry/full surrender, for the period 12/5/1969 to 11/11/1970.
In a continuation of geochemical exploration for possible large blind base metal sulphide orebodies which may have formed within the concealed Cambrian basement, North Broken Hill carried out infill sampling of significant mercury soil anomalies (>...-
Document
-
Sir Joseph Banks [Island Group]. Progress reports to licence expiry/renewal, for the period 1/8/1965 to 31/7/1966.
As soon as the SA Government restored public access to the subject ground within Spencer Gulf that it had temporarily reserved from the provisions of the State's Mining Act, Kennecott Explorations (Kennecott) took up SML 85 there to evaluate an...-
Document
Published: 06 Sep 1966
-
Spilsby Island. Progress and final reports to licence expiry/full surrender for the period 18/6/1970 to 17/6/1971.
SML 434 was taken out to enable making a re-assessment of the economic potential of exposed molybdenite-scheelite mineralisation first identified along the southern shores of Spilsby Island during 1963. There, outcropping equigranular Lower...-
Document
-
Spilsby Island. Progress reports and final report to licence full surrender, for the period 1/8/1966 to 28/6/1967.
South-westwards inclined diamond drillhole No. 11 was put in to 400 feet total hole depth by licensee Kennecott during the subject reporting period, to investigate the postulated buried inland extension of a continuously mineralised sheet-like body of...-
Document
Published: 31 Oct 1967
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017