-
Mutooroo [Station]. Progress reports to licence full surrender, for the period 11/9/1989 to 6/9/1994.
Exploration for possible heavy mineral sand marine placer deposits within Tertiary sediments on the northern margin of the Murray Basin comprised aircore drilling (28 holes, total 744 m) in the Mutooroo station area, 50 km south-east of Olary. The...-
Document
-
Cronje Dam. Progress reports and final report to licence expiry/full surrender, for the period 21/8/1979 to 29/11/1984.
Continuing exploration for possible hydrothermal or epithermal base metal and precious metal deposits, within an area centred 60 km south-west of Olary, at the outset targeted some previously identified geochemical anomalies, principally via shallow...-
Document
-
Anabama North. Data release made at licence expiry/renewal : annual reports submitted until the commencement of the Anabama JV Project licences' joint reporting, for the period 11/1/2001 to 30/4/2008.
An area centred ~50 km south-east of Manna Hill township on the Barrier Highway has been taken up to explore for possible economic buried epithermal, VHMS style copper-gold or other base and precious metal mineralisation which could have formed within...-
Document
Published: 11 Nov 1908
-
Anabama [Copper-Molybdenum Project]. Progress and final reports to licence expiry/renewal, for the period 26/10/1972 to 25/10/1974.
Ongoing exploration by the SA Department of Mines of the copper and molybdenum - mineralised Anabama Granite batholith, which is located 20 km south-east of Manna Hill, has involved detailed geological mapping, soil and rock chip sampling, and the...-
Document