-
Mount Stuart. Progress and final reports to licence expiry/full surrender for the period 5/1/1984 to 4/1/1987.
Epithermal, fault-related gold and base metals in calcareous Adelaidean metasediments (cf. the Beltana and Aroona zinc-lead deposits), and sedex style base metals of Mount Isa - McArthur River type, or stratiform base metals in black shale units, were...-
Document
-
SADME/Amdel Project 1/1/219: Geochronology of the Stuart Shelf. Progress reports nos 1-3 for the period 27/9/78 to 24/6/81.
There is no abstract created for this record-
Document
-
Sundown Creek. Progress and final reports to licence expiry/full surrender for the period 3/10/1977 to 2/10/1979.
Exploration undertaken in an area of practically no outcrop that is situated north and north-west of the Ediacara Range, on the eastern side of Lake Torrens, has aimed primarily at investigating the mineral potential of a large, low amplitude...-
Document
Published: 26 May 1980
-
Mount Josephine. Progress reports and final report to licence expiry/full surrender, for the period 5/12/1983 to 4/12/1985.
An area centred approximately 70 km north-east of Hawker has been explored by E-Z for possible economic stratabound lead-zinc deposits. The company's evaluation of the results of base metal exploration carried out previously in the Flinders Ranges had...-
Document
-
Teatree Well. Progress and final reports to licence expiry/full surrender for the period 5/1/1984 to 4/1/1986.
Exploration for possible fault-related epigenetic lead-zinc deposits formed in calcareous rocks outcropping along the Mount John - Arrowie fault system, to the south-east of the Moro mine, has included extensive stream sediment and rock chip sampling...-
Document
-
Mount Arden. Progress and final reports to licence expiry/full surrender for the period 6/8/1970 to 24/11/1972.
Resumed exploration for economic stratiform base metal deposits within basal Cambrian and upper Adelaidean metasediments in the area of the Arden and Ragless synclines, 20 km north of Quorn, concentrated on geochemical prospecting and detailed, 1:2000...-
Document
-
Woolly Dam. Progress reports and final report to licence expiry/full surrender, for the period 9/1/1978 to 8/1/1980.
Exploration undertaken in an area of practically no outcrop that is situated north and north-west of the Ediacara Range, on the eastern side of Lake Torrens, has aimed primarily at investigating the mineral potential of a large, low amplitude...-
Document
Published: 05 Jun 1980