-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
EPP 6, Eucla and western Duntroon Basins. Progress, technical and relinquishment reports for the period 20/9/68 to December 1975.
The programme of work pursued over EPP 6 was as follows: Permit Year 1 - interpretation of 566 line km of regional reconnaisance 6 and 24-fold reflection seismic data recorded in the 1968-69 R 3 Marine Seismic Survey, plus the ongoing review and...-
Document
-
Geochemical analysis of samples from Platypus 1 and Echidna 1, Duntroon Basin, offshore South Australia.
30 cuttings samples from Platypus 1 and 10 cuttings samples from Echidna 1 were analysed for total organic carbon (TOC), and appropriate samples then underwent Rock-Eval pyrolysis, if such pyrolysis data was not available from previous studies, to...-
Document