-
RB 73/00144 Second progress report Eyre Highway groundwater survey, Penong to the Western Australian border.
This report summarizes results of drilling to obtain water supplies for construction of the Eyre Highway, to the beginning of June, 1973. Drilling problems in the limestone have been encountered. Production from open trenches has been moderately...-
Document
Published: 01 Jan 1973
-
RB 63/00124 Port Augusta Hospital redevelopment geological investigations - Progress report on design stage, secn 1087 Hd Davenport - Public Buildings Department.
A site investigation has been carried out for the proposed redevelopment of Port Augusta Hospital. Exploration of the site has included examination of surface exposures and the construction of 5 drill holes totalling 250ft. Structures can be built on...-
Document
Published: 01 Jan 1966