Skip to content
Search Home
SARIG catalogue
  • HomeHome
  • Search Records
  • FAQs
  • Vocabularies
  • SARIG map SARIG map
  1. Datasets

Datasets

The mesac Open Data Portal datasets contain detailed records of seismic surveys and geochemical data, and they are made available here to industry, researchers and the public.
FILTER RESULTS
RESET
draw to search by area BY DRAWN AREA
RESET
Location SA

TYPE OF RECORD

  • document - (3)

TOPIC

  • Geoscientific Information - (3)

CATEGORY TYPE

  • Earth Sciences - (3)
    • Geology - (3)
      • Resource Geology - (3)
        • Mineral Resource Geology - (1)
      • Marine Geoscience - (2)
      • Petrology - (2)
      • Sedimentology - (2)
      • Stratigraphy - (2)
      • Geochronology - (1)
      • Paleontology - (1)
        • Palynology - (1)
      • Surface Geology - (1)
    • Geochemistry - (2)
      • Exploration Geochemistry - (1)
      • Hydrogeochemistry - (1)
    • Geophysics - (2)
      • Petrophysics - (1)
      • Radiometrics - (1)
    • Physical Geography - (2)
      • Geomorphology And Regolith And Landscape Evolution - (1)
      • Hydrogeology - (1)
      • Surfacewater Hydrology - (1)
  • Energy - (3)
    • Energy Exploration - (3)
    • Mining And Extraction Of Energy Resources - (3)
    • Preparation And Production Of Energy Sources - (1)
  • Engineering - (3)
    • Resources Engineering - (3)
      • Mining Engineering - (3)
      • Drilling Engineering - (2)
      • Mineral Processing/Beneficiation - (2)
      • Geomechanics And Resources Geotechnical Engineering - (1)
    • Chemical Engineering - (2)
    • Civil Engineering - (1)
    • Geomatic Engineering - (1)
  • Mineral Resources (Excl. Energy Resources) - (3)
    • Primary Mining And Extraction Of Mineral Resources - (3)
    • Mineral Exploration - (1)
  • Environmental Sciences - (2)
    • Environmental Science And Management - (2)
      • Environmental Management - (1)
      • Environmental Monitoring - (1)
    • Soil Science - (1)
      • Soil Chemistry - (1)
  • Information And Computing Sciences - (2)
  • Policy And Administration - (2)
  • Built Environment And Design - (1)
    • Urban And Regional Planning - (1)

DOCUMENT TYPE

  • Mineral Company Report - (2)
    • Mineral Exploration - (2)
  • Departmental Publication - (1)
    • Geological Survey Geoscience Publication - (1)

COMMODITY

  • coal - (3)
  • marble - (1)
  • salt - (1)
  • sulphur - (1)

GEOLOGICAL PROVINCE

  • Murray Basin - (3)

STRATIGRAPHY

  • Moorlands Lignite Member - (3)
  • Buccleuch Formation - (2)
  • Blanchetown Clay - (1)
  • Ettrick Formation - (1)
  • Mannum Formation - (1)
  • Murray Group - (1)
  • Norwest Bend Formation - (1)
  • Olney Formation - (1)

FORMAT

  • PDF - (3)

UPDATE FREQUENCY

There are no UPDATE FREQUENCY that match this search

PUBLICATION DATE

Specific date: 1980, 20/04/1980, 04/1980

Date range: 1980-2022, 04/1980-08/1990

close
Search records
ADVANCED KEYWORD SEARCH
Include the following keywords:

3 records found

Format: PDF Stratigraphy: Moorlands Lignite Member Category type: Mining Engineering

Filter Results
  • RB 78/00089;Env 02960 Appraisal drilling results, Anna Coalfield, Murray Basin, South Australia.

    At the Anna Coalfield, the November 1976 appraisal drilling by SADME of 2 rotary mud, partly cored vertical boreholes with a total penetration of 159.62 m (including 28.36 m of continuous ?NQ coring over the coal-bearing section) has confirmed the...
      Document Published: 11 May 1978
    • PDF
  • Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.

    Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...
      Document Published: 23 Nov 1984
    • PDF
  • Moorlands coal deposit conceptual mining study.

    Coal seam thickness averages 9.55 metres. In situ reserves are 8.85 MT. Recoverable coal reserves are 8.6 MT. Capital required to bring the mine into operation is $15.2 M. The real average cost of production is $13.69 / T.
      Document
    • PDF
Download in queue. Do not close this page.

Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.

Don’t want to wait? Request for a download link to be sent to you

Download started...

Your download will start automatically in a few seconds.

Request delivery

It usually takes us a few business days to deliver your selected downloads to you via an S3 bucket. Please leave your email address and we’ll be in touch when it’s ready.

Request submitted.

We’ll be in touch in the next few business days. Sometimes we can get a large number of requests, but we strive to get back to you quickly. If, after a few days you haven’t received an email, please email us on mesacOpenData@dnrme.qld.gov.au

Made with CKAN 2.9.7(1.79)
Acknowledgement
Copyright
Disclaimer
Privacy
Contact Us
South Australia Government