Moorlands coal deposit conceptual mining study.
Created: 12 Nov 2024 Revised: 12 Nov 2024

Coal seam thickness averages 9.55 metres. In situ reserves are 8.85 MT. Recoverable coal reserves are 8.6 MT. Capital required to bring the mine into operation is $15.2 M. The real average cost of production is $13.69 / T.

Coal seam thickness averages 9.55 metres. In situ reserves are 8.85 MT. Recoverable coal reserves are 8.6 MT. Capital required to bring the mine into operation is $15.2 M. The real average cost of production is $13.69 / T.

About this record

Record No mesac31531
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mineral Exploration
Contributor Coleman and Associates
Sponsor
Tenement EL 258
Tenement Holder Adelaide Brighton Cement Ltd
Operator
Geological Province Murray Basin
Mine Name Moorlands Coal Field
Stratigraphy
Commodity coal
Notes
Doc No: Env 03452 p: 177-259

Doc No: Env 03452 p: 177-259

Language English
Metadata Standard ISO 19115-3

Citations

Use constraints License
License Creative Commons Attribution 4.0
Persistent identifier https://pid.sarig.sa.gov.au/document/mesac31531
Citation Moorlands coal deposit conceptual mining study. Mineral Company Report - Mineral Exploration
https://pid.sarig.sa.gov.au/document/mesac31531

Technical information

Status
Maintenance and Update Frequency
Geographic Reference GDA2020 (EPSG:7844)
Geo bounding box {"type":"Polygon","coordinates":[[[139.5,-35.5],[140,-35.5],[140,-35],[139.5,-35],[139.5,-35.5]]]}
Purpose

                    
                    

                    
                  
Lineage