-
RB 86/00059 Berri East groundwater interception scheme hydrogeological investigation.
This detailed investigation evaluates data from both SADME drilling and investigations, and EWS drilling primarily in the alluvial sediments on Martins Bend. The aim was to determine aquifer properties, confirm water table gradients toward the river...-
Document
Published: 01 Oct 1986
-
Moorlands coal deposit conceptual mining study.
Coal seam thickness averages 9.55 metres. In situ reserves are 8.85 MT. Recoverable coal reserves are 8.6 MT. Capital required to bring the mine into operation is $15.2 M. The real average cost of production is $13.69 / T.-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Murray Basin Project. Joint annual reports, plus individual licence final reports at their respective full surrender, for the period 19/12/1997 to 30/6/2018.
Previous investigations of the Late Tertiary Murray Basin shallow marine littoral zone clastic sedimentary sequence (Loxton and Parilla sands) for heavy mineral sand (HM) placer accumulations have discovered numerous occurrences of economic to...-
Document