-
RB 86/00059 Berri East groundwater interception scheme hydrogeological investigation.
This detailed investigation evaluates data from both SADME drilling and investigations, and EWS drilling primarily in the alluvial sediments on Martins Bend. The aim was to determine aquifer properties, confirm water table gradients toward the river...-
Document
Published: 01 Oct 1986
-
RB 95/00037 Stonefield bedrock drilling, 1995.
Twenty-three vertical open RC drillholes with a total penetration of 2663 m were drilled by MESA during February and March 1995 along four W-E traverses in the Stonefield area near Truro, to determine bedrock geology and geochemistry below sedimentary...-
Document
Published: 01 May 1997
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnerships DPY9-43 - Brownlow and DPY9-47 - Bower. Drilling projects' joint interim and final reports.
Copper and gold mineralisation associated with felsic, intermediate and mafic igneous intrusive rocks which have intruded Adelaidean and Cambrian metasediments in the Nackara Arc region has been the target of exploratory drilling conducted with the...-
Document
-
Morgan. Progress reports and final report to licence full surrender, for the period 28/11/1977 to 1/9/1978.
During Dampier's exploration conducted near Morgan township in the western Murray Basin, the main target was possible economic coal measures in Cretaceous or Tertiary sediments, with the base metal potential of pre-Mesozoic basement rocks constituting...-
Document
-
Quondong. Progress reports and final report to licence expiry/full surrender, for the period 16/2/1979 to 15/2/1980. s and final reports to licence expiry for the period 16/2/1979 to 15/2/1980.
An open hole rotary mud drilling programme of 42 holes for 4939 m was used to evaluate the licence area for economic Tertiary fluvial sandstone - type uranium mineralisation, after previous and current explorers had identified buried uraniferous...-
Document
-
Northwestern Murray Basin - stratigraphy, sedimentology and geomorphology.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Murray Basin Project. Joint annual reports, plus individual licence final reports at their respective full surrender, for the period 19/12/1997 to 30/6/2018.
Previous investigations of the Late Tertiary Murray Basin shallow marine littoral zone clastic sedimentary sequence (Loxton and Parilla sands) for heavy mineral sand (HM) placer accumulations have discovered numerous occurrences of economic to...-
Document