-
Bookabie. Annual reports to licence expiry/full surrender, for the period 8/10/2013 to 7/10/2016.
An area centred ~85 km west-northwest of Ceduna has ben explored for possible buried Ni±Cu±Co±Cr±PGE mineralisation of either Thomson Nickel Belt or Nova-Bollinger deposit styles, that may be associated with ultramafic–mafic rocks at four prospects...-
Document
Published: 07 Nov 1916
-
RB 2020/00015 Reconnaissance zircon U-Pb geochronology of the southeastern Olympic Cu-Au Province, South Australia.
The eastern Gawler Craton is the location of the Olympic Cu-Au Province, a world-class metallogenic province known for iron oxide - associated copper-gold (IOCG) deposits such as Olympic Dam, Prominent Hill and Carrapateena (Skirrow et al., 2007;...-
Document
Published: 01 Aug 2020
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Poondinga. Partial surrender report at licence expiry/renewal, for the period 23/11/1993 to 22/11/1998.
Reconnaissance, helicopter-borne geological mapping and rock chip geochemical sampling were carried out within the Yellabinna Regional Reserve, 70 km northeast of Penong. No anomalies were identified, but the area retains considerable Cu-Au...-
Document
-
Bookabie. Annual, progress and final reports to licence expiry/full surrender, for the period 26/8/1994 to 25/8/1999.
Ground magnetic surveys were carried out 100 km west - northwest of Ceduna, over an area of masking Tertiary and Cainozoic cover underlain by a basement of Mulgathing Complex and syntectonic Lincoln Complex and Hiltaba Suite granitoids, to recover...-
Document
Published: 22 May 1900
-
Tallala Hill. First partial surrender report, for the period 23/11/1993 to 22/11/1996.
The Cu-Au potential of the coastal area between Fowlers Bay and Colona was downgraded by an absence of significant aeromagnetic and regional soil/calcrete anomalies. Calcrete results may, however, reflect the effects of groundwater and seawater...-
Document
Published: 22 Nov 1996
-
Childara Dam. Annual reports for the period 24/3/95 to 23/3/97.
An area located 80 km east-northeast of Ceduna, which lies entirely within a conservation park and regional reserve, was recognised as one of considerable potential for copper and gold mineralisation associated with shear zones active around the time...-
Document
Published: 02 May 1997
-
Spilsby Island. Progress reports and final report to licence full surrender, for the period 1/8/1966 to 28/6/1967.
South-westwards inclined diamond drillhole No. 11 was put in to 400 feet total hole depth by licensee Kennecott during the subject reporting period, to investigate the postulated buried inland extension of a continuously mineralised sheet-like body of...-
Document
Published: 31 Oct 1967