-
Maitland [second JV programme]. Progress reports for the period 17/8/81 to 14/5/84.
Continuing mineral exploration work over central Yorke Peninsula under a new joint venture arrangement with a different company, now targetting possible Phanerozoic sedimentary uranium in Cambrian and Tertiary strata, has consisted of investigations...-
Document
-
Minlaton. Progress reports plus final report to licence full surrender, for the period 27/4/1977 to 6/12/1978.
One diamond and seven rotary/percussion drillholes tested Cambrian rocks for base metals. Six water bores were logged geophysically. IP/resistivity and gravity surveys were undertaken.-
Document
-
Bute. Progress reports and final report to licence full surrender, for the period 16/1/1980 to 30/6/1982.
In the latter stages of its search for possible economic base and precious metal deposits in the Bute area, North Broken Hill targeted the concealed pre-Adelaidean basement rocks for Mount Gunson or ?Olympic Dam type hydrothermal ores, and for Mount...-
Document
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1978 to 28/9/1979.
As part of ongoing base metal exploration of the area surrounding Bute, initial work done after the expiry of EL 248 comprised the completion of one diamond drillhole to TD 411.2 m within Carpentarian basement, targeting a magnetic anomaly thought to...-
Document
Published: 20 Nov 1979