Maitland [second JV programme]. Progress reports for the period 17/8/81 to 14/5/84.
Created: 12 Nov 2024 Revised: 12 Nov 2024

Continuing mineral exploration work over central Yorke Peninsula under a new joint venture arrangement with a different company, now targetting possible Phanerozoic sedimentary uranium in Cambrian and Tertiary strata, has consisted of...

Continuing mineral exploration work over central Yorke Peninsula under a new joint venture arrangement with a different company, now targetting possible Phanerozoic sedimentary uranium in Cambrian and Tertiary strata, has consisted of investigations of the Pavey and Glenburnie radiometric anomalies, and of IP anomalies near the Parara mine. Trace uranium and base metal values were found in the Cambrian and Tertiary sequences intersected by DDH Ardrossan 1 (TD 220.5 m), but no economic mineralization was encountered. Further work is recommended at the Parara mine, where copper, lead, zinc and tungsten anomalism is associated with disseminated chalcopyrite-pyrrhotite veining in calc-silicate rocks.

More +

About this record

Record No mesac31143
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mineral Exploration
Contributor Terradex Corp.;Robertson Research (Australia) Pty Ltd;Central Mineralogical Services
Sponsor
Tenement
Tenement Holder Pegmin Pty Ltd;Otter Exploration NL
Operator Otter Exploration NL
Geological Province
Mine Name Parara mine;Pavey anomaly;Glenburnie anomalies
Stratigraphy
Commodity
Notes
Notes: Includes:  - Ardrossan Area Maitland Project.  - Logistics report on an airborne radiometric magnetic survey covering one area of the Yorke Peninsula (Ardrossan). (Appendix to quarterly report to 12/3/80).  - Ardrossan area. Aeromagnetic...

Notes: Includes: - Ardrossan Area Maitland Project. - Logistics report on an airborne radiometric magnetic survey covering one area of the Yorke Peninsula (Ardrossan). (Appendix to quarterly report to 12/3/80). - Ardrossan area. Aeromagnetic survey. Interim reports. (1) Tectonic interpretation. (2) Computer models. (Appendix 1 in quarterly report ended 12/6/80). - Ardrossan area. Radiation spectrometer interpretation report. (Appendix 1 in report ended 9/9/80). - Bedrock geology intersected by Ardrossan area RAB drilling programme. Mineralogical report no. 3076. (Appendix 1 in quarterly report ended 12/12/80). - Maitland. Progress reports and final report to licence full surrender, for the period 12/9/1979 to 7/5/1981. - Gravity and magnetic interpretation, Ardrossan. (Appendix 1 in quarterly report ended August 1982). - Ardrossan 1, Maitland. Drilling report. Geographic Locality: Maitland;Glenburnie;Pavey Creek;Cunningham;Cooinda;Kainton;1979 Ardrossan Aerial Radiometric Survey Doc No: Env 03616 p: 192-462 Drillhole: Ardrossan 1;Aquitaine SYP602;P1 - P5 Drillhole Unit No: 6429 00479

More +

Language English
Metadata Standard ISO 19115-3

Citations

Use constraints License
License Creative Commons Attribution 4.0
Persistent identifier https://pid.sarig.sa.gov.au/document/mesac31143
Citation Bluck, R.G.;Bichard, A.N.;Bowen, E.A.;Kojan, C.J.;Cowan, D. Maitland [second JV programme]. Progress reports for the period 17/8/81 to 14/5/84. Mineral Company Report - Mineral Exploration
https://pid.sarig.sa.gov.au/document/mesac31143

Technical information

Status
Maintenance and Update Frequency
Geographic Reference GDA2020 (EPSG:7844)
Geo bounding box {"type":"Polygon","coordinates":[[[137.5,-34.5],[138,-34.5],[138,-34],[137.5,-34],[137.5,-34.5]]]}
Purpose

                    
                    

                    
                  
Lineage