-
Port Broughton (part of Moonta Project). Partial relinquishment report for the period 23/5/2002 to 22/5/2003.
Olympic Dam style iron oxide hosted copper-gold mineralisation was the target of exploration in an area 20 km east of Port Broughton. Geological field observations and a review of available data indicate that the target Mesoproterozoic basement in...-
Document
Published: 07 Jul 1903
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Alford. Annual reports to licence expiry/renewal, for the period 25/10/2007 to 4/11/2012.
Work performed at the Alford Project, until the latter half of 2007, had so far mainly concentrated on the Netherleigh Park prospect, with the density of drilling there now providing the main insights into prospectivity and controls on mineralisation....-
Document
-
Marion Bay. Annual reports and final report to licence surrender, for the period 18/3/1997 to 17/9/2000.
Calcrete was sampled over the entire foot of Yorke Peninsula, approximately 200 km by road from Adelaide, to follow up aeromagnetic structures and anomalous base metals in groundwater. Several samples returned slightly elevated base metals, from...-
Document
Published: 18 Dec 1900