-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
Data release [made at SA Director of Mines' discretion] : Wadnaminga, Manna Hill, Mount Victor, Yunta and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 3/4/1997 to 18/7/2008.
A group of five adjoining exploration licences covering ~3300 square km situated along the southern flank of the Proterozoic Curnamona Craton (Olary Block) and the adjoining Nackara Arc of the Adelaide Geosyncline is being explored for possible...-
Document
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
Coonalpyn. Progress reports and final report to licence full surrender, for the period 29/3/1982 to 6/9/1985.
Cambrian rocks lying beneath relatively thin Phanerozoic cover on the western edge of the Murray Basin were targeted by CSR principally for stratiform volcanogenic massive copper sulphide deposits, and for epigenetic Palaeozoic gold occurrences...-
Document
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017