-
Mount Painter district (the Gunsight Joint Venture Project). Individual licence's progress reports and annual reports to project licences' joint full surrender, for the period 1/12/1982 to 16/11/1993.
There is no abstract created for this record-
Document
-
Gunsight aerial magnetic/radiometric survey, Mount Painter region, December 1982. Metadata.
Comprises the operator's summary of survey details, plus a SADME record location manifest for output data map transparencies and flight line record digital tapes.-
Document
Published: 01 Jan 1983
-
Gunsight and Yudnamutana. Quarterly and annual reports for the period 25/5/79 to 30/8/83.
A sequence of exploration programs in the Mount Painter Province, undertaken on Special Mining Leases since 1965, have been previously released. Exploration for base metals, gold, uranium and REE since 1974, in an area extending 50 km southwest from...-
Document
-
Moolawatana. Progress reports for the period 18/5/1972 to 17/5/1973.
There is no abstract created for this record-
Document
-
Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-28, Mount Woods IOCG Project mineral prospect. Project final report.
PACE Initiative Year 3 drilling project funds were secured by Goldstream Mining to explore for base metals and gold within two licence areas taken out over concealed Proterozoic basement of the Mt Woods Inlier, and which also cover parts of the Coober...-
Document
Published: 12 Dec 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2005 to 6/11/2010. [ Index Part 2 of 2 ].
During the first year of renewed tenure under EL 3445, the work done consisted of performing diamond and RC drilling programmes which were partly funded by PIRSA's PACE Initiative as Theme 2, Year 2 and 3 approved Drilling Collaboration Projects. The...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-13, Gemini mineral prospect. Project final report.
The Mount Woods South Joint Venture (Adelaide Resources Ltd and Perilya Ltd) successfully made application for a share of the SA Government's PACE Initiative funding in 2004 to test geophysical anomalies located on EL 2901 which were defined by...-
Document
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 1915
-
Engenina Creek - Mount Brady and Balta Baltana Creek areas, south-east of Coober Pedy. Progress reports and final annual report to licences' expiry/full surrender, for the period 6/4/1981 to 23/6/1993.
{ELs 822, 1145, 1494 programme}: TARGET: Roxby Downs and Tennant Creek - style copper, gold, and uranium, plus diamonds in kimberlite diatremes and metamorphic and hydrothermal breccia - related iron ore, in the Engenina Creek area, 60 km south-east...-
Document
Published: 24 Jul 1993
-
Birthday Hill (part of the Stuart Range Joint Venture Project). First progress report plus final report to licence expiry/full surrender, for the period 30/3/1977 to 29/3/1978.
During exploration carried out in an area located approximately 60 km south-west of Anna Creek, Newmont targeted Zambian Copperbelt - style mineralisation similar to perceived equivalents of the then newly discovered and poorly understood Olympic Dam...-
Document
-
Mount Sandy (part of the Stuart Range Joint Venture Project). Progress reports and final report to licence expiry/full surrender, for the period 3/5/1977 to 2/5/1978.
Following the first public announcement on 18/11/1976 by Western Mining Corp. of its giant Olympic Dam copper, gold and uranium discovery on Roxby Downs Station, Newmont Pty Ltd began a detailed assessment of the Stuart Shelf region of South...-
Document
-
Danae Hill (part of the Stuart Range Joint Venture Project). Progress reports and final report to licence full surrender, for the period 30/3/1977 to 31/7/1978.
Following the first public announcement on 18/11/1976 by Western Mining Corp. of its giant Olympic Dam copper, gold and uranium discovery on Roxby Downs Station, Newmont Pty Ltd began a detailed assessment of the Stuart Shelf region of South...-
Document
-
Balta Baltana Creek. Annual reports and final report to licence expiry/full surrender, for the period 2/1/2007 to 1/1/2012.
Exploration for possible economic base and precious metal deposits in buried basement rocks, and for possible sedimentary uranium mineralisation in overlying Jurassic-Cretaceous Eromanga Basin sediments, within an area centred about 80 km east of...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Brady (part of the Mount Woods Project). Annual reports for the period 10/7/2007 to 9/7/2011.
A very small, ~90 square km licence area centred ~40 km south-east of Coober Pedy is being explored for possible economic IOCG or other types of metallic mineralisation that may have formed in concealed Proterozoic basement rocks. During the first...-
Document
-
Balta (part of the Edward Creek Project). Annual reports and final report to licence expiry/full surrender, for the period 9/10/2000 to 17/7/2010.
An area located approximately 35 km west and south-west of Anna Creek Homestead, straddling the Coober Pedy - William Creek Road, was taken up to explore for possible buried diamondiferous kimberlite intrusions that could be the source(s) of the...-
Document
-
RB 2013/00020 The South Australian Atlas of Geoscience and Mineral Exploration data - Woomera Prohibited Area within the Gawler Craton.
The Woomera Prohibited Area (WPA) is a military testing range covering ~127,000 square km of the land surface of central South Australia. Underlying it are highly prospective rocks of the Gawler Craton, a major province of the earth's crust which...-
Document
Published: 01 Nov 2013
-
Mount Fitton. Annual reports and first partial surrender report, for the period 26/5/1997 to 25/5/2000.
No anomalous results were returned from BCL drainage sampling in the Mt Fitton - Billy Springs area, approximately 140 km north-east of Leigh Creek.-
Document