-
Maitland. Annual reports and final report to licence surrender, for the period 7/9/1992 to 24/9/2004.
Exploration undertaken by MIM across all of north-central Yorke Peninsula initially targeted Fe-oxide associated Olympic Dam style Cu-U-Au deposits within Palaeoproterozoic metasediments and volcanic rocks, which could be genetically related through...-
Document
Published: 02 Dec 1903
-
Arthurton. Annual reports to licence expiry/full surrender, for the period 26/3/1999 to 25/3/2001.
An area of central Yorke Peninsula south of the Moonta-Wallaroo-Kadina mining field was acquired to explore for Cu-Au and Pb-Zn targets in metasomatically altered Mesoproterozoic rocks of the southern Gawler Craton, adjacent to their contact with the...-
Document
-
Maitland. First partial surrender report, for the period 7/9/1992 to 6/3/1996.
Exploration in the Curramulka and Pine Point areas on east-central Yorke Peninsula targeted Olympic Dam style iron oxide - associated copper-gold (IOCG) deposits related through contact metasomatism to Hiltaba Suite equivalent granites. A gravity...-
Document