-
Kapunda. Progress reports, annual reports and technical consultants' reports submitted until licence expiry/full surrender, for the period 30/11/1981 to 29/5/1985.
Economic evaluation of the Kapunda copper deposit for open pit mineability has included the acquisition of experimental and ore - definitive EIP and MIP surveys along strike extensions of the main fault zone, the commissioning of consultants' detailed...-
Document
Published: 29 Jul 1985
-
Interpreted basement geology to the Murray Basin and surrounds.
The purpose of this interpretation is to provide an initial framework for the basement to the Murray Basin upon which to plan the Geological Survey of South Australia’s MinEx CRC National Drilling Initiative drilling project targeting the Delamerian...-
Map
Published: 07 Jul 2020
- PDF,
- ZIP