-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
EL 6401 - Billa Kalina area. Annual technical reports from 11/09/2019 to full surrender 27/03/2023.
Exploration Licence 6401 lies in northern South Australia around 600km NNW of Adelaide. The town of William Creek lies around 80km north of the tenement. The tenement sits to the east of the Mt Woods Inlier where a large amount of exploration has...-
Document
Published: 27 Mar 1923
-
Bulgunnia. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 10/8/1981.
The base metal and uranium potential of a concealed Proterozoic basement high near Bulgunnia Homestead was evaluated using geological and hydrogeochemical reconnaissance and regional geophysical interpretation approaches. Seismic, ground magnetic and...-
Document
-
RB 2020/00012 Gawler Craton Airborne Geophysical Survey Region 8A, Coober Pedy West – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Apr 2020
- PDF,
- ZIP
-
RB 2010/00002 GOMA basement drilling program, northern Gawler Craton.
The GOMA basement drilling program was named after the Gawler-Officer-Musgrave-Amadeus deep seismic reflection survey line, that was completed in 2008 by Geoscience Australia (GA) as part of its Onshore Energy Security Program. Funding for the seismic...-
Document
Published: 01 Feb 2010