-
1991 marine seismic survey, DH91, final report.
AIM: The DH91 seismic survey programme was designed to provide new 2D coverage of potential prospects and leads in an offshore area with very little modern seismic data, especially in the southeastern part of the permit. Complementary 1983 and 1984...-
Document
-
Geochemical analysis of samples from Platypus 1 and Echidna 1, Duntroon Basin, offshore South Australia.
30 cuttings samples from Platypus 1 and 10 cuttings samples from Echidna 1 were analysed for total organic carbon (TOC), and appropriate samples then underwent Rock-Eval pyrolysis, if such pyrolysis data was not available from previous studies, to...-
Document