-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Mount Josephine. Progress reports and final report to licence expiry/full surrender, for the period 5/12/1983 to 4/12/1985.
An area centred approximately 70 km north-east of Hawker has been explored by E-Z for possible economic stratabound lead-zinc deposits. The company's evaluation of the results of base metal exploration carried out previously in the Flinders Ranges had...-
Document