RB 44/00063 Myponga Dam Project - Geological investigation of the tunnel route on the proposed pipeline from the reservoir.
Detailed geological examination of the area in the vicinity of the proposed tunnel has shown that, provided suitable precautions are taken, there are no geological factors which will prevent the successful construction of a tunnel through the ridge...-
Document
Published: 02 May 1957
-
Data release - as updated [made at SA Director of Mines' discretion] : the Adelaide Hills Project. Joint annual reports for the period 16/5/2005 to 31/12/2013.
The Adelaide Hills Project consists of 3419 square km of land covered by eight contiguous exploration licences, ELs 3057, 3064, 3141, 3215, 3239, 3277, 3425 and 3534, which are owned by or joint ventured to Flinders Diamonds Limited (FDL). By an...-
Document
-
RB 28/00105 Final report on a geological investigation of the Myponga Dam site (Lower Site no. 2).
A programme of bedrock diamond drilling has been completed by the SA Department of Mines at the locations of the proposed storage dam abutments and foundation at Lower Dam Site no. 2 on the Myponga River. The logs of the drill cores are presented, and...-
Document
Published: 25 Sep 1950
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-49, Bird-In-Hand Mine Deeps Project gold mineral prospects. Project final report.
At the historic Bird-In-Hand mining claim, where previous mine exploration drilling beneath the old workings by current licence operator Maximus Resources had delineated an inferred remaining gold resource of 53,000 ounces over the depth extent from...-