-
Data release - as updated [made at SA Director of Mines' discretion] : the Adelaide Hills Project. Joint annual reports for the period 16/5/2005 to 31/12/2013.
The Adelaide Hills Project consists of 3419 square km of land covered by eight contiguous exploration licences, ELs 3057, 3064, 3141, 3215, 3239, 3277, 3425 and 3534, which are owned by or joint ventured to Flinders Diamonds Limited (FDL). By an...-
Document
-
Port Pirie. Progress reports and final report to licence full surrender, for the period 21/8/1979 to 30/6/1982.
Continuing exploration for possible buried Mount Gunson and Olympic Dam type copper deposits, or other stratabound base metal occurrences within shelfal facies of Adelaidean sediments or in the pre-Adelaidean Wandearah Formation Carpentarian age...-
Document
-
Port Pirie. Progress reports to licence expiry/renewal, for the period 20/4/1977 to 19/4/1979.
Concerted exploration for possible stratiform Mount Gunson type or epithermal Olympic Dam type base metal deposits, on the south-eastern edge of the Stuart Shelf near Port Pirie, was begun by North Broken Hill Ltd in response to the public release by...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-49, Bird-In-Hand Mine Deeps Project gold mineral prospects. Project final report.
At the historic Bird-In-Hand mining claim, where previous mine exploration drilling beneath the old workings by current licence operator Maximus Resources had delineated an inferred remaining gold resource of 53,000 ounces over the depth extent from...-
Document
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1976 to 9/6/1978.
There is no abstract created for this record-
Document