-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Noorina Dam, Birthday Hill, Codna Hill and Cadaree Hill. [Diamond exploration - sole risk and joint venture] Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 23/9/1983 to 29/5/1990.
TARGET: Possible diamonds and source diamondiferous kimberlites in the Boorthanna Trough region. EXPLORATION: Present-day drainage heavy mineral sampling for kimberlitic indicators, follow-up barrage sampling for diamonds, an aerial magnetic survey...-
Document
-
Ely Hill & Ant Hill. Joint first annual & final report for the period 10/1/1997 to 13/1/1998 (Ant Hill Project minerals search), plus joint first partial surrender report for the period 14/7/1997 to 8/12/1998 (Coober Pedy North Project opal exploration).
Two structurally controlled Cu-Au targets, plus a possible kimberlite pipe and a coal prospect, were interpreted in re-processed geophysical data derived from an area approximately 55 km north-northwest of Coober Pedy. The area was seen to contain...-
Document
Published: 09 Mar 1999