-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
Duntroon Basin. [Well critiques].
Contains summary pictorial montages of the operator's post-mortem assessment of the value of drilling each Duntroon Basin wildcat completed to date.-
Document
-
1992 marine seismic survey, DH92, final report.
AIM: To confirm a number of prospects and leads outlined with the most recent interpretation of the existing seismic data over both permit areas. Due to the presence of shallow intrusives and difficulty in mapping the basement in certain areas,...-
Document
-
1991 marine seismic survey, DH91, final report.
AIM: The DH91 seismic survey programme was designed to provide new 2D coverage of potential prospects and leads in an offshore area with very little modern seismic data, especially in the southeastern part of the permit. Complementary 1983 and 1984...-
Document