Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 1918
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-25, southern Gawler Ranges Volcanic Province, Victory IOCG mineral prospect. Project final report.
Southern Gold Ltd, in joint venture with Hindmarsh Resources, has drilled four vertical RAB with diamond tail holes on Exploration Licence 3158 from October to November 2005 as part of the PACE Initiative Year 2 programme. Its objective was to test a...-
Document
-
Green Patch. Progress, annual and final reports to licence surrender for the period 8/7/1991 to 1/3/1996.
Following a review of previous company exploration and image interpretation of SAEI and BMR aeromagnetic data, a 3166 line km airborne magnetic/radiometric survey, with follow-up ground magnetics and air core drilling (282 holes, 4559 m), was carried...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document