-
1988 seismic survey, Gambier, final report.
AIM: The 1988 Gambier Seismic Survey of semi-detailed and regional data acquisition was shot principally to upgrade the prominent Glenburnie lead in the northeast of PEL 28 into a drillable prospect. This lead, identified 1n 1986 by the Burrungule...-
Document
-
1986 seismic survey, Burrungule detail, operations report.
AIM: This seismic survey of 35 lines with a total coverage of 200.1 line kms was shot to further detail leads identified by the 1985 Burrungule Seismic Survey, and thereby attempt to upgrade at least two of them to drillable prospect status. The work...-
Document
-
1985 seismic survey, Burrungule, final report.
AIM: This seismic survey of 32 lines with a total 352.26 line kms coverage was conducted in the two most prospective areas of the licence in order to fulfil the Licence Year 1 work commitment of at least 250 line kms of seismic acquisition. The two...-
Document
-
The Padthaway Ridge Sedimentary Uranium Project. Joint annual technical reports to licences' combined full surrender, for the period 30/1/2008 to 3/9/2013.
A package of fourteen mineral exploration tenements were taken up that straddled the north-eastern and south-western sides of the Padthaway Ridge, to allow the licensee to explore both the Tertiary Murray Basin and Gambier Basin sediments where they...-
Document
Published: 16 Jul 1913
-
Hawksnest, Geegeela, Keppoch, Bordertown, Sugarloaf Hill, Kumorna and Peacock Range. Combined report covering either the respective licences' first partial surrender or full surrender, for the period 30/1/2008 to 29/1/2010.
A number of portions of licence areas flanking known outcropping uraniferous basement rocks of the Padthaway Ridge have recently been relinquished, after originally being taken up to explore for possible economic sandstone-type uranium deposits that...-
Document
Published: 01 Feb 1910