-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
RB 2012/00014 Age of host rocks at the Chianti Cu-Au prospect, eastern Gawler Craton, from zircon U-Pb geochronology.
The primary aim of the U-Pb geochronology work reported herein was to constrain the age of granites that form the principal host unit to the minor mineralisation and extensive alteration present within the Chianti Cu-Au prospect located in the eastern...-
Document
Published: 01 Oct 2012
-
RB 2016/00009 Geological field excursion guide — IOCGs – where it all began: the Moonta-Wallaroo region of the eastern Gawler Craton.
INTRODUCTION TO THE GUIDE Northern Yorke Peninsula (NYP) is within the southern portion of the Olympic Domain of the eastern Gawler Craton, which is arguably the world’s most fertile IOCG belt. That such a belt existed was only realised when Western...-
Document
Published: 01 May 2016
-
Data release - as updated [made at SA Director of Mines’ discretion] : Pernatty [Station]. Annual reports for the period 29/11/2005 to 28/11/2009.
An area centred approximately 110 km north of Port Augusta, covering part of the Pernatty Ridge plateau on the south-western side of Lake Torrens, approximately 145 km south-east of the Olympic Dam mine, was taken up to explore for possible economic...-
Document
Published: 24 May 2010
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 2017
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 2011