-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
Geophysical review - Prospect evaluation, SA offshore permit SA-7.
EPP 7 work conditions for 1975 (permit Year 7) required evaluation and review studies to be carried out with the aim of defining at least three areas which may have prospects geologically and geophysically as sites for wells. This report sets out the...-
Document