-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Honeymoon project - hydrological report on the HC 9 pumping test conducted February-March, 1980.
Regional and site-specific geological and hydrological factors are discussed, and a groundwater model is proposed for the Honeymoon uranium deposit, based on the results of the HC 9 drilling and testing programme, and on other existing data. A...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola, Moolawatana and Mount Hopeless (the Frome Basin Project). Joint annual report for the period 1/1/2016 to 31/12/2018.
Exploration Licence 5017 Arkaroola, Exploration Licence 5118 Mt Yerila and Exploration Licence 5261 Petermorra cover a combined area of approximately 1831 square km within the northern Flinders Ranges and the Frome Basin. The area is being targeted...-
Document
Published: 16 Jan 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Wooltana. Annual reports for the period 8/8/1997 to 23/9/2009.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately south of the Beverley uranium deposit and covering the southern end of the Poontana Sub-basin,...-
Document
Published: 23 Nov 1909
-
Goulds Dam and Katchiwilleroo Dam (temporarily part of the Goulds Dam JV Project). Data release made at licences' joint expiry/lapse of tenure : joint annual reports for the period 27/8/2009 to 26/8/2014.
During 2009-2010, the first year of the subject licences' joint annual reporting, 27 vertical open exploratory rotary mud holes were drilled to basement on EL 3905 Goulds Dam for a total penetration of 3564 m, to search for redox fronts that may exist...-
Document
Published: 23 Oct 1914