-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Billeroo West. Progress and technical reports for the period 30/6/80 to 7/11/87.
TARGET: Sedimentary uranium in Tertiary palaeochannels, plus Olympic Dam or sedex type base and precious metal deposits in the Proterozoic basement. EXPLORATION: Ground magnetic, gravity and SIROTEM surveys, one 600 metre deep diamond drill hole (BW...-
Document
Published: 24 Dec 1987
-
Benagerie. Progress reports and annual reports, plus final report to licence full surrender, for the period 13/11/1979 to 9/3/1989.
TARGET: Sedimentary uranium in Tertiary sandstone, plus Olympic Dam type copper-gold mineralisation and Broken Hill or Mount Isa type stratiform base metal mineralisation in the underlying basement rocks. EXPLORATION: Stratigraphic drilling (162...-
Document
-
Lake Frome South and Lake Frome North (the Wertaloona Project). Joint annual reports to licences' surrender, for the period 8/11/2010 to 3/9/2013.
The southern half of Lake Frome salina, centred about 80 km south-southeast of the Beverley uranium mine, has been explored for possible commercial quantities of dissolved lithium and uranium. Interest in the former commodity was engaged by the...-
Document
Published: 11 Oct 1913
-
Paralana Hill. Progress and technical reports to licence expiry/renewal for the period 23/9/1975 to 22/9/1977.
As part of ongoing regional Tertiary stratigraphic appraisal work, an area located to the south and east of the Beverley uranium deposit was explored for economic roll-front style sedimentary uranium mineralisation by conducting resistivity surveys...-
Document
Published: 06 Jul 1977