-
RB 60/00111 River Murray drainage investigation. Progress report no. 2 - stratigraphy and micropalaeontology of bores and surface sections.
Stratigraphic data are provided for: Waikerie Pumping Station - cliff section, Waikerie Bore No. 1, Waikerie Bore No. 1A, Ramco Heights Bore No. 1, Sunlands Pumping Station - cliff section, Sunlands Bore No. 2 and Tolleys Rising Main section (all in...-
Document
Published: 02 Jun 1965
-
Cronje Dam and Oak Bank Outstation (the Cronje Dam Sedimentary Uranium Project). Annual and joint annual reports, plus final report at remaining licence's expiry/full surrender, for the period 20/10/2005 to 1/11/2014.
An area comprised of three separate sub-blocks generally located ~60 km south of Manna Hill and ~70 km south-southeast of Olary has been explored for Tertiary sedimentary uranium which may have formed in buried north to south trending palaeochannels...-
Document
-
RB 71/00033 RENMARK, South Australia, sheet SI54-10 International Index.
There is no abstract created for this record-
Document
Published: 01 Jan 1972
-
Lignum Dam. Progress reports plus final report to licence full surrender, for the period 7/1/1974 to 27/5/1975.
As follow-up to a programme of uranium exploration lately carried out in its adjoining EL 63, Tricentrol chose to drill an additional area of prospective Tertiary Murray Basin sediments present in the vicinity of the Anabama Fault zone, to further its...-
Document
Published: 07 May 1975
-
ExpNotes RENMARK: Explanatory Notes RENMARK
There is no abstract created for this record-
Document