-
Cronje Dam and Oak Bank Outstation (the Cronje Dam Sedimentary Uranium Project). Annual and joint annual reports, plus final report at remaining licence's expiry/full surrender, for the period 20/10/2005 to 1/11/2014.
An area comprised of three separate sub-blocks generally located ~60 km south of Manna Hill and ~70 km south-southeast of Olary has been explored for Tertiary sedimentary uranium which may have formed in buried north to south trending palaeochannels...-
Document
-
Lignum Dam. Progress reports plus final report to licence full surrender, for the period 7/1/1974 to 27/5/1975.
As follow-up to a programme of uranium exploration lately carried out in its adjoining EL 63, Tricentrol chose to drill an additional area of prospective Tertiary Murray Basin sediments present in the vicinity of the Anabama Fault zone, to further its...-
Document
Published: 07 May 1975
-
Mutooroo. Progress reports and final report to licence expiry/full surrender, for the period 4/5/1973 to 3/5/1975.
In a search for possible buried sedimentary uranium mineralisation which may have been precipitated adjacent to the northern margin of the Murray Basin in SA, following long term palaeodrainage transport of the dissolved weathering products of primary...-
Document