-
Mount Pitt. Progress and final reports for the period 6/4/81 to 5/10/81.
As part of a regional search for economic small-scale deposits of rare earth metals in the Mount Painter district, geochemical prospecting revealed several atypically high background niobium values, in stream sediments derived from watercourses known...-
Document
-
Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
Freeling Heights - Mount Adams area. Progress reports for the period 10/6/1968 to 9/12/1969.
As part of a regional search for economic uranium and copper mineralisation, the US-based company Kennecott Copper in November 1968 performed a semi-detailed airborne spectrometer survey of 550 line miles in the Shamrock Valley - Freeling Heights -...-
Document
-
Moolawatana. Quarterly and final reports for the period 26/8/75 to 25/8/76.
Ongoing copper/uranium exploration of basement and Willouran cover southwest of Moolawatana comprised ground magnetic, IP, EM and TEM surveys, airborne EM (Turair) and magnetic surveys, prospect-scale geochemical surveys and limited diamond drilling...-
Document
Published: 01 Nov 1977
-
Yudnamutana Hill - Arkaroola Creek area, Mount Painter district. Interim progress report for the period 7/7/1968 to 6/1/1969.
As part of a regional search for possible economic uranium and copper-molybdenum deposits formed in Precambrian basement and overlying early Adelaidean cover metasediments, Kennecott Explorations conducted a reconnaissance aerial radiometric survey of...-
Document