-
Childara Well. Annual reports and final report to licence expiry/full surrender, for the period 19/2/2004 to 18/2/2009.
An area lying along the south-western margin of the Gawler Ranges has been explored by Minotaur Resources to assess the economic iron oxide - associated copper-gold mineralisation (IOCG) potential of near-coincident gravity and magnetic anomalies that...-
Document
Published: 23 Mar 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Deception Hill. Annual reports and final report to licence full surrender, for the period 26/10/2004 to 9/10/2013.
The iron oxide - associated copper-gold (IOCG) mineralisation potential of an area centred ~20 km south of Tarcoola, which appeared to contain untested but interesting gravity and soil geochemical anomalies, was investigated by Minotaur to try to...-
Document
Published: 28 Oct 1913
-
Data release [made at SA Director of Mines' discretion] : Lake Labyrinth West - Lake Harris West area (the Glenloth JV Project). Annual reports to licence expiry/renewal, for the period 25/5/1998 to 10/7/2008.
Continued exploration for Archaean lode-style gold and Mesoproterozoic Hiltaba Suite granite-related hydrothermal Cu-Au within the retained southern former subarea 'B' of EL 2518 located ~40 km south-east of Tarcoola, where there is also potential...-
Document
Published: 08 Oct 1908
-
Data release [made at SA Director of Mines’ discretion] : Lake Gairdner South [SW margin]. Annual reports to licence expiry/renewal, for the period 25/10/2002 to 24/10/2007.
An area flanking the south-western margin of Lake Gairdner was taken up by Rudy Gomez to explore for possible economic buried precious and base metal epithermal mineralisation of Olympic Dam or Tunkillia style within volcanic rocks of the Proterozoic...-
Document
Published: 05 Apr 1908
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-11 - Renaissance Uranium Ltd, Tanner Dam Project, Gawler Range Volcanics - hosted primary uranium mineralisation, magnetic anomaly targets. Drilling project interim and final reports.
In execution of Renaissance Uranium's approved PACE 2020 Discovery Drilling 2012 project designated DPY7-11, which was partly subsidised by DMITRE to assist in company high-risk high-reward mineral exploration within South Australia, 2 exploratory RC...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Tanner Dam North. Final report at licence full surrender, for the period 22/11/2012 to 26/2/2014.
An area centred approximately 130 km north-northwest of Kimba has been explored for possible economic primary uranium mineralisation, where the principal target is the igneous rock succession of Mesoproterozoic Gawler Range Volcanics (GRV) and...-
Document
-
Tanner [Dam]. First annual report plus final report to licence expiry/full surrender, for the period 21/12/2011 to 20/12/2013.
An area centred approximately 120 km north-northwest of Kimba has been explored for possible economic primary uranium mineralisation, where the principal target is the igneous rock succession of Mesoproterozoic Gawler Range Volcanics (GRV) and...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-36, Dingo Hill (Cariewerloo Basin) Palaeozoic / Mesoproterozoic unconformity - related uranium mineral prospects. Project interim and final reports.
The Dingo Hill prospect lies within the eastern Gawler Craton, approximately 90 km west of Port Augusta. EL 3579 licensee Hindmarsh Resources is exploring for possible economic secondary stratiform uranium mineralisation associated with regional...-
Document