-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 1909
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Glenloth area (the Tarcoola JV Project). Annual reports for the period 11/7/2008 to 2/11/2018.
A biogeochemical sampling survey consisting of 20 lines (407 samples) was undertaken by the JV partners during August 2009, targeting buried gold mineralisation. Black Oak and Pearl Bluebush were the dominant deep-rooted plant species sampled and, to...-
Document
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Rounsevell Hill, Yellabinna and Mulgathing Homestead (the Ambrosia Project). Joint annual reports for the period 24/5/2005 to 1/6/2015.
Some large areas of vacant ground located in the south and west of Mulgathing Station that lie adjacent to the Bulgunnia Fault Zone were taken up by Monax Mining initially to explore primarily for Olympic Dam type IOCG-U mineralisation and also for...-
Document
Published: 06 Oct 1915
-
Arcoona (part of the Torrens Project). First partial surrender report for the period 17/5/2002 to 16/5/2003.
Olympic Dam style iron oxide hosted copper-gold mineralisation was the target of exploration in an area immediately south-east of Andamooka. Following geological and geophysical interpretations of available data, a soil sampling program and partial...-
Document
Published: 11 Jul 1903
-
Nuckulla Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/10/2002 to 28/11/2008.
Exploration for possible buried Ernest Henry or Olympic Dam style copper-gold mineralisation in the Nuckulla Hill area, 120 km north-east of Ceduna, did not progress during the first two years of tenure due to uncertainties in selecting a new remote...-
Document
Published: 22 May 1909
-
Hesso, Bookaloo, Arcoona and Lake Torrens South (the Torrens Project). Annual reports and final reports to project licences' respective sequential full surrender or expiry/full surrender, for the period 23/9/2002 to 18/4/2006.
Olympic Dam or Moonta-Wallaroo style concealed iron-oxide copper-gold mineralisation hosted in Palaeoproterozoic and Mesoproterozoic basement rocks of the Stuart Shelf, and Mount Gunson type younger Neoproterozoic sediment-hosted buried copper...-
Document
Published: 12 Oct 1906
-
Uno. Progress reports and final report to licence full surrender, for the period 10/12/1971 to 10/9/1972.
TARGET: Sediment hosted uranium. EXPLORATION: Radiometric survey along tracks. 6 diamond drillholes. RESULTS: Low uranium levels in Corunna Conglomerate in DDH Au-U-6.-
Document
Published: 10 Sep 1972