-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 1912
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918