-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Nuckulla Hill. Annual and final reports to licence expiry/full surrender for the period 12/7/2004 to 11/7/2009.
As part of a search for possible Tunkillia type structurally-controlled buried gold deposits within an area located approximately 120 km north-east of Ceduna, licensee Southern Gold targeted geochemical and geophysical anomalies that had previously...-
Document
Published: 27 Oct 1909
-
Lake Labyrinth (part of the Gawler Joint Venture Project). Data release made at the surrender of a subsequently renewed licence (EL 3252) : annual reports for the period 27/7/1994 to 26/7/1999.
Exploration for possible economic buried magmatic/epithermal/hydrothermal/metamorphic gold and copper deposits, which may have formed within Archaean and Proterozoic basement rocks in an area located approximately 24 km north-west of Kingoonya,...-
Document
-
Gosse and Kingoonya (part of the Mentor Project, and later the Kingoonya Project). Data release made at joint partial relinquishment upon licences' expiry/renewal: annual reports for the period 3/12/1997 to 28/9/2008. [Index Part 2 of 2].
In continuing exploration carried out by Mount Isa Mines Exploration (MIM) during 1998 on EL 1792 / 2467 Gosse and EL 1798 / 2466 Kingoonya, additional calcrete sampling and RC drilling (25 holes for 1590 m total penetration) took place at four...-
Document
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Childara Well. Annual reports and final report to licence expiry/full surrender, for the period 19/2/2004 to 18/2/2009.
An area lying along the south-western margin of the Gawler Ranges has been explored by Minotaur Resources to assess the economic iron oxide - associated copper-gold mineralisation (IOCG) potential of near-coincident gravity and magnetic anomalies that...-
Document
Published: 23 Mar 1909
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release [made at SA Director of Mines' discretion] : Mullaquana. Annual reports for the period 20/11/2006 to 19/11/2009.
A tenement area located close to and along the eastern seaboard of the Eyre Peninsula, and which extends from Whyalla southwards for approximately 60 km, has been taken up to explore for possible economic buried primary, hard rock hosted uranium and...-
Document
Published: 20 Jun 1910
-
Cedric Bore. Annual reports plus final report to licence expiry/full surrender, for the period 2/4/2002 to 17/6/2008.
An area centred ~ 80 km north of Tarcoola was taken under licence to explore for possible economic buried precious and base metallic mineralisation hosted by Archaean and Proterozoic basement rocks. The area was selected on the basis of it having...-
Document
Published: 16 Sep 1908
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 1921
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Heartbreak Hill. Annual reports to licence expiry/full surrender, for the period 27/9/1996 to 26/9/1997.
Mulgathing Complex and Hiltaba Suite rocks were interpreted from aeromagnetic data obtained in areas located 10 km north of, 70 km south-east of, and 35 km south of Tarcoola. Calcrete sampling was followed by RAB drilling (178 holes, total 5047 m)...-
Document
-
Tarcoola - Kingoonya (Glenloth) areas. Joint annual reports, and first partial relinquishment report, for the period 4/3/1993 to 24/5/2001.
Exploration for Archaean lode-style gold and Hiltaba Suite granite-related hydrothermal Cu-Au in two licence sub-areas near Tarcoola targeted Archaean greenstone lithologies interpreted from aeromagnetic data, Mesoproterozoic intrusive-associated...-
Document
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 1915
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-21 - Eyre Peninsula Project, Central Gawler Gold Province, Baggy Green North prospect biogeochemical anomaly. Drilling project final report.
Early in 2016, Adelaide Resources submitted a proposal to DSD for a grant of PACE Initiative Year 9 collaborative drilling project subsidy funds to help it drill ~80 exploratory aircore or RC holes for a total of approximately 8000 m to further...-
Document
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919