-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
Woorong Creek. Data release : annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 1/6/2000 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 45...-
Document
-
Kulliparu. Annual reports and final report to licence expiry/full surrender, for the period 21/1/2010 to 20/1/2013.
An area located approximately 60 km east of Streaky Bay was taken up primarily because of old reports of gold prospectivity in the north of the tenement area at and near the historic Kattata mine. Marmota Energy considered that regional geological...-
Document
Published: 19 Feb 1913
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-27 - north-eastern Cleve Domain - basement granite investigations related to the Mullaquana area Tertiary sediment-hosted uranium mineral prospect. Final report.
The area of the Mullaquana Exploration Licence 3652 is underlain by a circular aeromagnetic anomaly which has been interpreted as being potentially a Hiltaba Suite granite pluton that may be the source of the uranium mineralisation recently discovered...-
Document
Published: 30 May 1911
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 2 of 2].
In March 2010, once the terms of the joint venture agreement had been finalised, Argo passed its complete data sets to Xstrata, who immediately commenced a re-logging of Argo's drill cores besides conducting comprehensive unconstrained 3-D modelling...-
Document
Published: 15 Nov 1913
-
RB 2001/00004 CHILDARA bedrock drilling program.
Fifty-eight shallow aircore holes totalling 2140.5 m were drilled by PIRSA's Mineral Resources Group in the Ceduna area during November 1999 to as part of a programme designed to assist regional mapping and geological interpretation of the CHILDARA...-
Document
Published: 01 Aug 2001