-
Mount Plantagenet. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 8/1/1982 to 7/1/1986.
Detailed base and precious metals exploration undertaken by Utah Development Company in the area of the Worumba Anticline has targeted possible stratiform Zambian Copperbelt - type deposits. Exploratory work has included 72 geochemical vertical...-
Document
-
Data release - as updated : Statton Hill (part of the Baratta Project). Annual reports, first partial surrender report and final report to licence full surrender, for the period 8/10/2007 to 14/1/2016.
Copper and gold exploration has been conducted within an area centred about 80 km east of Hawker, which it was thought had potential for epigenetic vein style mineralisation within buried Adelaidean sandstone and shale strata, formed in a stratabound...-
Document
Published: 19 Jan 1916
-
Eighteen Mile Hut and Oopina [Outstation] (the Waukaringa Project). Joint annual reports plus final report to licences' respective expiry/full surrender or transfer of ownership, for the period 12/3/2013 to 11/3/2018.
Two separate licence areas located within the greater Waukaringa region north of Yunta in the Adelaide Fold Belt were taken up to explore for possible economic buried gold (both primary and secondary mineral occurrences), and also for any economic...-
Document
Published: 15 May 1918
-
Hallett (part of the Nackara Gold Project). Annual reports and final report to licence expiry/full surrender, for the period 9/8/2002 to 4/10/2012.
An area of high country in the far northern Mount Lofty Ranges was taken under licence to try to find the primary source(s) of widely dispersed detrital gold known from Recent and Tertiary cover sediments in the region, while focussing mainly on...-
Document