-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919
-
Data release - as updated : Cockabidnie. Annual reports and final report to licence expiry/full surrender, for the period 31/5/2001 to 13/8/2015.
Early in 2001, Helix Resources Ltd entered into a joint venture agreement with Centrex Resources Limited to allow it to explore for precious and base metals on some of the tenements held by Centrex on the Eyre Peninsula in South Australia, including...-
Document
-
Mount Hill (part of the Gum Flat Iron Ore Project). Final report at licence full surrender, for the period 25/2/2008 to 27/8/2015.
A small part of the Lincoln Uplands on east-central Eyre Peninsula, which is centred ~20 km north-east of Cummins, has been explored for possible economic buried graphite and/or base metal mineralisation that may have formed in metamorphosed...-
Document
Published: 22 Jun 1915
-
Wanilla (originally part of the Wanilla JV Project). Annual reports submitted until the commencement of licences' joint reporting for the Gum Flat Iron Ore Project, for the period 13/2/2007 to 12/2/2010.
A large north-south orientated area centred ~45 km north-west of Port Lincoln was taken up to explore for possible buried Archaean komatiite-hosted nickel, volcanic hosted massive sulphides (base metals), orogenic lode gold, BIF-hosted iron ores and...-
Document
Published: 01 Jun 1910
-
Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project, then the Coober Pedy Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 2 of 4 ].
After Poseidon Exploration took over the management of ELs 1448 and 1465 in November 1991 as a result of a supplementary farm-in agreement made with Burmine, whereby Poseidon would fund the next two year's of exploration to earn Burmine's 50% interest...-
Document
-
Darke Peake. Progress reports for the period 15/6/79 to 27/9/82.
In a search for possible buried Palaeoproterozoic unconformity - related sedimentary uranium deposits over an area east of the Darke Range, an ongoing programme of exploratory work has included geological mapping at 1:25,000 scale, analysis of 205...-
Document