-
RB 93/00004 Tarcoola - Tallaringa bedrock drilling 1991. Summary.
Archaean and Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
Published: 01 Feb 1993
-
Tarcoola - Tallaringa Bedrock Drilling Project.
Archaean, Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
RB 2013/00014 IOCG-style mineralisation in the central eastern Gawler Craton, SA; characterisation of alteration, geochemical associations and exploration vectors.
While South Australia is well known as having within its borders major iron oxide - associated copper-gold (IOCG) deposits such as Olympic Dam, Prominent Hill, Carrapateena and Hillside, there has until now been a lack of publically accessible...-
Document
Published: 01 Oct 2013
-
Ironstone Hill. Annual reports to licence expiry/full surrender, for the period 11/8/1997 to 10/8/2000.
An airborne magnetic/radiometric survey and surficial calcrete, soil and MMI sampling targeted Challenger/Tunkillia-type gold and Olympic Dam style copper-gold, associated respectively with a number of shear zones and with the Charleston Granite,...-
Document
-
North-west Gawler Craton drilling investigations, 1991. Data package, parts A and B.
There is no abstract created for this record-
Document
-
Data release - as updated : Moonabie (part of the East Eyre Peninsula Project). Annual reports plus final report to licence expiry/full surrender, for the period 1/5/2006 to 13/3/2017.
A licence consisting of three separate sub-blocks that are centred approximately 60 km WSW of Whyalla is being explored for possible economic primary uranium mineralisation plus precious and base metals, in a structurally complex epithermal and...-
Document
Published: 29 Apr 2017