-
RB 60/00025 Geological report no. 1 on Brennand anomaly, Hd Koppio, southern Eyre Peninsula, Cummins 1-mile sheet.
A potential iron ore deposit has been investigated in the upper horizon of jaspilite beds of the Hutchison Group, where a drag fold has caused a thickening of the jaspilite beds. Surface samples average 42.2% acid soluble iron. The deposit has a...-
Document
Published: 08 Feb 1965
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Data release - as updated : Moonabie (part of the East Eyre Peninsula Project). Annual reports plus final report to licence expiry/full surrender, for the period 1/5/2006 to 13/3/2017.
A licence consisting of three separate sub-blocks that are centred approximately 60 km WSW of Whyalla is being explored for possible economic primary uranium mineralisation plus precious and base metals, in a structurally complex epithermal and...-
Document
Published: 29 Apr 1917
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-29, Wilcherry Hill Magnetite Project, Hercules Proterozoic stratabound iron ore mineral prospect. Project interim and final reports.
Iron ore mineralisation similar to that mined in the Middleback Range has been investigated at the Hercules prospect, located 90 km west-northwest of Whyalla, where a large, high intensity aeromagnetic anomaly and associated 12 km long outcrop of...-
Document