-
Midgee (latterly part of the Cowell JV Project). Sixth partial surrender report, for the period 26/11/2003 to 21/1/2022.
A partial relinquishment of ~50% of the previous area of EL 6350 has been made to comply with licence renewal and expenditure conditions, with 35 square km of the southern sub-block being relinquished, now reducing its area to 11 square km. The...-
Document
Published: 21 May 1921
-
Data release - as updated [made at SA Director of Mines’ discretion] : Cowell (latterly part of the Cowell JV Project). Annual reports for the period 7/11/2008 to 6/11/2011.
No field work was undertaken during licence Year 7, but Stellar instead did a review of the Cowell area's prospectivity for Tertiary palaeochannel-hosted sedimentary uranium mineralisation. Previous drilling data for the local Pirie Basin sediments...-
Document
Published: 05 Dec 1911
-
Murninnie. Annual reports and final report to licence expiry/full surrender, for the period 19/4/2006 to 14/11/2013.
During August 2006, Australasia Gold acquired a 45% interest in the historic abandoned Murninnie copper mine (Private Mine 156) and a surrounding small exploration licence (EL 3542), which are located ~30 km south-southwest of Whyalla. In July 2007,...-
Document
Published: 13 Oct 1914
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007